Case Study

Reform & Revive

A complete shop fit-out — turning an empty unit into a pilates studio and wellness cafe, with construction and electrical work handled start to finish by one contractor.

Client Reform & Revive
Sector Pilates Studio & Cafe
Scope Full Shop Fit-Out
Trades Construction & Electrical
The brief

An empty unit, a full transformation

Reform & Revive needed an empty commercial unit turned into a working pilates studio with a wellness cafe attached — new stud walls and ceilings, decorative arched features, flooring throughout, a fitted cafe kitchen, a wet room, and a full electrical installation to match.

Because the same contractor handled both trades, the electrics were planned in from the framing stage — sockets, data, lighting circuits and air conditioning positioned before the walls were even boarded, rather than chased in afterwards.

Illuminated Reform and Revive sign installed on feature wall
Stage 01 — The Shell

A bare industrial unit — steel roller shutter, mezzanine, exposed structure. This is where the project started.

Stage 02 — Framing & First Fix

Stud walls, door openings and built-in shelving framed out, with electrical first-fix — cabling, sockets and lighting points — run before boarding.

Stage 03 — Plastering & Flooring

Walls plastered, arched feature alcoves formed, and herringbone flooring laid throughout the studio.

Stage 04 — The Finished Space

Backlit signage, air conditioning, a fitted cafe kitchen and wet room — construction and electrics finished together.

Before & after

The same room, transformed

Planning a fit-out or renovation?

Whatever the scale, one contractor can handle the build and the electrics together — get in touch to talk it through.

Call Now WhatsApp